-Colongra Power Station (4 by GT 13E2) 600MW Output
-Sydney Desalination Plant
-Shell Mogas Improvement Project
-Mt Arthur North Project (2)
-Spencer Street Station Redevelopment
-Replacement Research Reactor
-Port Qasim Cold Box Repair
-Mt Arthur North Project (1)
-The Bass Gas Project
-Replacement Research Reactor
The Bass Gas Project
Lang Lang, Victoria

Scope of Work:
Fabrication and delivery of Inlet Separator, Stabilizer Feed Surge Drum, Regeneration Gas Scrubber, TBX Expander Inlet Scrubber, Amine Flash Vessel, C02 Stripper Reflex Drum, Amine Stripper, Butane Storage Bullet and Propane Storage Bullet.

Specific Project Challenges:
Due to the size of the vessels, transport issues were a major factor in the process.

Solution to Overcome Challenges:
Trailers were specially manufactured to cope with the length and support the weight of the manufactured vessels.

Delivery Method:
Road transport to Victoria

Project Details
Location: Lang Lang, Victoria
Award Date: 12/2002
Duration: 43 weeks from contract award date
Safety Statistics
Man Hours: 65,700
First Aid Incidents: 7
Medical Treatments: 4
Lost Time Injuries: 0
Near Misses: 11